A crawler excavator’s hourly fuel cost depends on two numbers: the fuel consumed per hour and the delivered price of that fuel. Consumption, however, is not fixed by machine size alone. Engine load, material, cycle times, idling and operating technique can change the result substantially, so a quoted litres-per-hour figure should be treated as an estimate rather than a project guarantee.
On a foundation excavation, for example, an excavator may alternate between hard digging, truck loading and waiting for the next truck. A budget based only on continuous digging can overstate fuel use during waiting periods, while a budget based on light work can understate the cost of sustained excavation. The most useful purchasing comparison combines hourly fuel cost with the amount of acceptable work completed in that hour.
For a consistent operating period, calculate fuel consumption using fuel issued to the machine and engine-hour readings:
Average fuel consumption = fuel used in litres ÷ engine hours
Fuel cost per engine hour = average litres per hour × delivered fuel price per litre
Use equivalent tank levels at the beginning and end of the measurement period, and account for all fuel added between readings. A refill amount on its own is not necessarily the amount burned during that period. Delivered price should reflect the cost of getting fuel to the site, not just the advertised pump price.
Engine hours usually include idling. That makes them useful for estimating the fuel cost of keeping a machine available throughout a shift. If the question is the cost of productive excavation, also record productive hours and completed output separately. Do not divide shift fuel use by productive hours and then describe the result as consumption per engine hour.
Fuel is only one part of ownership and operating cost. An hourly equipment budget may also need to include maintenance, wear parts, undercarriage costs, operator labour, financing or depreciation, insurance and transport. Keep these items separate from the fuel calculation so that assumptions can be checked and updated.
Dense, compacted or abrasive material generally demands more effort than loose soil. Deep cuts, repeated breakout and heavy attachments can increase hydraulic demand and engine load. The same machine can therefore burn fuel at different rates on different parts of a site.
Machine size matters, but rated engine power is not an hourly fuel-use figure. A larger excavator may use more fuel per engine hour yet complete the required volume sooner. Conversely, an oversized machine working lightly or waiting for trucks may consume more fuel than the task warrants. Match capacity to the expected workload rather than selecting on power alone.
Long swing movements, poor access to the digging face and trucks positioned too far away can add time to every cycle. Excessive repositioning also uses fuel without moving material into the truck. Where site conditions permit, arrange the excavation and loading area to reduce unnecessary swing and travel while maintaining safe clearances.
Idle time has a different effect: it usually lowers the average litres per engine hour compared with continuous heavy digging, but it adds fuel cost without adding output. A low hourly average can therefore conceal a poor cost per cubic metre.
Running at a higher power setting than the task requires, repeatedly overfilling the bucket or forcing an unsuitable digging angle can waste fuel. Operators should use the manufacturer’s recommended settings and match the bucket and digging method to the material. A lower-power mode is worth assessing for lighter work, but only if it maintains the required production rate.
Blocked filters, incorrect track tension, worn bucket teeth and hydraulic faults can also affect performance. Fuel consumption alone does not identify the fault: compare it with symptoms such as slow cycles, unusual heat, smoke or reduced digging performance. Follow the maintenance schedule, and investigate persistent changes before assuming the site conditions are responsible.
For purchasing decisions, calculate the fuel cost of the work itself as well as the hourly rate:
Fuel cost per cubic metre = fuel used × delivered price per litre ÷ measured cubic metres moved
Use the same basis for both machines. In particular, establish whether volume is measured in the ground or after excavation, because material expands when loosened. Also compare similar material, digging depths, truck availability and shift conditions. Bucket capacity alone cannot establish production: fill level, cycle time and waiting time all affect actual output.
A machine that burns more fuel each hour can still have a lower fuel cost per cubic metre if it moves enough additional material. The reverse is also true: a low-consumption machine may be more expensive per unit if it is undersized, struggles with the material or extends the project schedule. Include the cost of the additional operating time when comparing alternatives.
Specifications help determine whether an excavator can reach and handle the intended work, but they do not establish its site fuel consumption. Ask suppliers for the basis of any consumption figure: operating mode, load, material, idle time and whether the figure represents engine hours or productive hours. A range with stated conditions is more useful than a single unexplained number.
For a requirement in the 23-ton class, the SDSG DC230 Crawler Excavator is one specification to evaluate. It has a 1.1–1.2 m³ backhoe bucket, a 135 kW rated engine and a maximum digging depth of 6,660 mm. Those figures can help screen it for earthmoving or foundation work, but they do not predict litres per hour. Its 350 L fuel tank indicates storage capacity, not consumption or guaranteed operating duration.
Check whether the stated engine configuration and emissions specification are suitable for the intended market before purchase. Also compare transport dimensions, attachment requirements and service arrangements, since a machine that fits the excavation but creates avoidable transport or downtime costs may not be the lowest-cost option.
For a long project, repeat the comparison when the material, haul arrangement or attachment changes. A baseline recorded during easy excavation should not be carried unchanged into a harder digging phase; separating those conditions makes the next fuel forecast more useful.